2014 Port Update

Port of Indianola: 2014 Recap

January

  • John Lane (6-year term) and Eric Cookson (2-year term) sworn in as new Port Commissioners
  • Susan Henry appointed Port Auditor
  • Port Master Plan update started – Commissioner Cookson
  • Dock piling replacement Request for Quotation submitted to 4 small works roster qualified contractors – Thank you, Art Langlie

February

  • Quotes received from contractors – Quigg Brothers submitted lowest qualified bid
  • Port of Indianola Mission Statement revised via Resolution

March

  • Potential General Obligation Bond terms and conditions discussed
  • Piling replacement permitting discussed – Kitsap County, Corp of Engineers, WA Dept. of Fish & Wildlife
  • Master Plan update constituent survey finalized
  • Public Records Request added to Port of Indianola website

April

  • Resolution 2014-6 passed honoring John R. Jacobsen for his long-term service to the Port of Indianola
  • Cashmere Bank and K & L Gates confirm General Obligation bond paperwork is prepared
  • Piling replacement permit completion continues
  • Scope of piling replacement reduced from 14 bents to 10 bents to comply with Corp of Engineers requirements, revised RFQ created – Thank you, Art Langlie

May

  • Volunteers replace 24 dock planks – Thank you, John Lane, Paul Larson, and Tim Butler
  • Swim float modifications finalized

June

  • Construction permits submitted to Kitsap County and Corp of Engineers – Thank you, Connie Reckord and Lisa Fitch
  • Swim float installed following necessary modifications
  • Modifications performed by Bill Henry – Port responsible for materials, Bill Henry donated labor

July

  • Master Plan survey received
  • Dock Fund Committee created – Susan Hancock, Chair
  • Fundraising meeting will be planned to discuss ongoing deck maintenance and upcoming 100-year anniversary of the dock in 2016

August

  • Permits received from Kitsap County and Corp of Engineers for piling replacement project
  • General Obligation bond paperwork finalized with Cashmere Bank

September

  • Discussions on next phase of dock repairs
    • Design improvements and potential changes to head of dock
    • Connie and Terry Reckord to compile potential changes and ideas
  • Piling replacement completed – 10 bents, 20 pilings, 10 piling caps – Quigg Brothers completed within contract terms

October

  • Preliminary 2015 Budget discussed and completed
  • Connie Reckord submits ideas for community input and potential design for dock entrance – Bents 1–5
  • Fundraising Committee meeting held

November

  • Master Plan is completed and ready to proceed
  • 2015 Budget Resolution passed
  • Master Plan revision notice published in North Kitsap Herald – Adoption of revised Master Plan anticipated in January 2015
  • Plank Holder Certificate design completed and available for purchase

December

  • Plank Holder Certificate income has exceeded $5,000 through mid-December
  • Future Commissioners Work Study meeting discussed to share procedural details